2019 - Containerised Wastewater Treatment Plant for Le Meridien Hotel
The 300m3/day Clearfox® wastewater treatment plant was installed. A team from Germany also attended onsite.
2019 - Supply and installation of wastewater pumps at the WMA
Two pumps of 11kW each and related accessories was installed at the Wastewater Management Authority Pumping Station at Petit Camp
2019 - Marine navigation buoy for the WMA
A 1500mm marine navigation buoy was installed at around 1.7km from the shore of Baie du Tombeau to warn vessels about an outlet discharge
2019 - MEP works at the George V Stadium
For the Indian Ocean island Games of 2019, we carried out the refurbishment of all MEP works.
2018 - Largest potable water pumps for the CWA in Mauritius
Two 355kW and two 90kW pumps were installed at the Central Water Authority including flow meter, instrumentation systems, swithgear, generator, fire alarms and CCTV system.
2017 - Greenfield Data centre for Mauritius Telecom
We carried out the MEP works for the data centre including the chillers, AHUs, VRVs and diesel storage facilities.